X

 

During the OBLEX-F1 campaign AXYS has had their FLiDAR 6M (formerly known as the WindSentinel) stationed close to the FINO-F1 met mast. The buoy is equipped with two lidars and has maintained over 98% dava availability during the winter months. The FliDAR 6M has during this period had to weather winter storms with wave heights exceeding 8 meters and wind gusts over 38 knots (20 m/s). Below is a video showing the buoy navigating during a spot of bad weather

 

 

 

 

 

 

 

 

News

13. 07. 2018

Open positions related to offshore wind at University of Bergen. ...

read more >>

28. 06. 2018

The University of Bergen is opening Bergen Offshore Wind Centre...

read more >>


Calendar/ Upcoming Events

13. september 2018

SMI Bergen...

read more >>

17. september 2018

EERA JP Wind annual event...

read more >>

17. oktober 2018

Workshop in collaboration with GCE NODE...

read more >>